New home start checklist for your books

What to set up before the first bill hits a new house, so job cost is right from day one instead of repaired at month end.

Short answer: Before the first bill arrives on a new house, load the signed estimate as the budget, create one project for the house in QuickBooks Online and your project software, confirm the cost code list and its QuickBooks mapping, onboard vendors with a W-9, insurance and lien waiver form, set up deposits as a liability, map the lender budget if there is a loan, and decide who codes and approves bills. Twenty minutes of setup saves hours of correction.

Starting several houses this year? Our team sets up each one in your books before the first bill. Request a Relationship Assessment.

Why the start matters

Job costing breaks at the beginning of a house, not at the end. A bill that arrives before the project exists gets coded to overhead or to the wrong house, and it stays wrong until someone finds it at month end. Buildertrend and JobTread both build their reports on the budget and cost codes loaded at the start, and both sync to QuickBooks Online through its Products and Services and projects. If those are not set up first, the sync copies the problem across. The fix is a short checklist run once per house.

The checklist

WhenStepDone means
At contract signingLoad the signed estimate as the budget by cost codeBudget matches the contract, including allowances and contingency. See how to job cost a custom home.
At contract signingCreate the house as one projectOne project in QuickBooks Online and in your project software with matching names. Buildertrend requires each job to be linked to a QuickBooks Customer, Sub-Customer or Project, and a client must be on the job for the Customer to be created. See classes vs projects.
At contract signingConfirm cost codes and mappingEach code maps to one Product or Service. See cost codes.
At contract signingRecord the deposit as a liabilityCash received before work is billed sits in a customer deposit account, not income. See retainage and customer deposits.
Before the first billOnboard vendors and subsW-9, insurance certificate, license where required and your lien waiver form on file. See 1099 and sub compliance and lien waivers.
Before the first billIssue purchase orders and sub agreementsCommitments are in the system before work starts. See committed costs.
Before the first drawMap the lender budget to your cost codesOne mapping, built once. See lender draw budget vs job budget.
Before the first drawSet the draw and payment scheduleBilling milestones are agreed with the client. See draw schedule design.
First weekDecide the rulesWho codes bills, who approves them, which cards charge to houses and how late bills are handled. See the accounts payable workflow.
First weekDecide where warranty and contingency goBoth have a home before the first call. See contingency and warranty reserves.

Vendor onboarding, in one place

The IRS describes Form W-9 as the form a payee gives to supply a taxpayer identification number, which a business needs to prepare an information return such as a 1099. Collect it before the first payment, not in January. Add an insurance certificate and your lien waiver form at the same time, so compliance is a gate for the first bill rather than a chase later. Rules for notices and waivers vary by state, so check yours. See our glossary on the notice of commencement and lien waivers.

If the house has a construction loan

Test it with one bill

Enter the first real bill and check four things: it lands on the right house and code, it appears in the project software and in QuickBooks, it is reflected in committed cost if there was a purchase order, and the budget report moves. If any of those fail, fix the setup before the second bill. See the tie-out.

How we help

Our team runs this setup for every new house, and then closes the books each month so the numbers stay right. Our founder reviews every close. We quote a flat monthly price for each builder, starting at $1,500 a month, with typical engagements between $2,500 and $8,500 a month. Start with a $1,500 Margin Review for written findings. See job costing, construction bookkeeping, pricing or request a Relationship Assessment.

Sources

Common questions

What should be set up before a new house starts?

The budget by cost code, one project for the house, the cost code mapping, vendor onboarding, deposits as a liability and, if there is a loan, the lender budget mapping.

Why does setup matter for job costing?

Bills that arrive before the project exists get coded to overhead or the wrong house, and the project software sync copies those errors into QuickBooks.

What should I collect from a new subcontractor?

A W-9, an insurance certificate, a license where required and your lien waiver form, before the first payment.

How should a customer deposit be recorded?

As a liability until it is applied to billing, not as income.

How do I check that a new house is set up correctly?

Enter the first real bill and confirm it lands on the right house and code, appears in both systems and moves the budget report.

Can you set up new houses for us?

Yes. Our team runs this setup for each new house and closes the books monthly.

Related

By John Mos, Founder. Updated . We do not give tax or legal advice. Please ask your CPA or attorney.