Free template

A cost code starter list for custom and spec home builders, free to download

Twelve divisions in the order a house is built, with sub-codes you can trim or extend. Download it as a spreadsheet and adapt it to how you estimate.

Short answer: This is a free starter list of cost codes for a custom or spec home, organized in the order a house is built, from pre-construction to closeout. Download the CSV, delete what you do not use and add what you do. Then use the same list in your estimate, your project software and QuickBooks Online, so budget versus actual compares like with like.

Download the CSV

The starter list

CodeNameTypical cost type
01 Pre-construction
01.10Plans and designSubcontract
01.20Engineering and surveysSubcontract
01.30Permits and feesOther
01.40Soil testing and inspectionsSubcontract
01.50Builder risk and project insuranceOther
02 Site work
02.10Clearing and demolitionSubcontract
02.20Excavation and gradingSubcontract
02.30Utilities and connectionsSubcontract
02.40Septic or wellSubcontract
02.50Erosion control and temporary siteOther
03 Foundation
03.10Footings and foundation wallsSubcontract
03.20Concrete flatworkSubcontract
03.30Waterproofing and drainageSubcontract
03.40BackfillSubcontract
04 Framing
04.10Framing lumber and materialsMaterial
04.20Framing laborSubcontract
04.30Trusses and engineered lumberMaterial
04.40Sheathing and house wrapMaterial
05 Roofing and exterior envelope
05.10RoofingSubcontract
05.20Gutters and downspoutsSubcontract
05.30Siding and trimSubcontract
05.40Masonry and stoneSubcontract
06 Windows and exterior doors
06.10WindowsMaterial
06.20Exterior doorsMaterial
06.30Garage doorsMaterial
06.40InstallationSubcontract
07 Mechanical, electrical and plumbing
07.10Plumbing rough and finishSubcontract
07.20HVACSubcontract
07.30Electrical rough and finishSubcontract
07.40Low voltage and securitySubcontract
07.50FireplaceSubcontract
08 Insulation and drywall
08.10InsulationSubcontract
08.20Drywall hang and finishSubcontract
08.30Texture and patchingSubcontract
09 Interior finishes
09.10Interior trim and millworkSubcontract
09.20Interior doors and hardwareMaterial
09.30FlooringSubcontract
09.40TileSubcontract
09.50Cabinets and countertopsSubcontract
09.60Paint and wall coveringsSubcontract
09.70AppliancesMaterial
10 Exterior finishes
10.10Landscaping and irrigationSubcontract
10.20Driveway and walksSubcontract
10.30Decks, porches and railingsSubcontract
10.40Fencing and poolSubcontract
11 Allowances
11.10One line per allowance, for example lighting, flooring or appliancesAllowance
12 Jobsite, overhead on the job and closeout
12.10Dumpsters and portable toiletsOther
12.20Temporary power and utilitiesOther
12.30Superintendent and job laborLabor
12.40Final cleaningSubcontract
12.50Warranty reserveOther

How to adapt it

  1. Trim to what you buy. If you never build pools, delete 10.40. A shorter list is faster to code.
  2. Match your estimate. If your estimates group framing differently, change this list to match them, not the other way round.
  3. Keep one list. The same codes belong in the estimate, Buildertrend or JobTread, and QuickBooks Online. Different lists are the most common reason budget and actual do not compare. See cost codes for custom home builders.
  4. Allowances get their own lines. One line per allowance, so overages show up. See allowance tracking.
  5. Cost codes are not houses. You still tag every cost to the house. Code and house together are what make a job cost report.

Cost code or cost type?

The third column suggests whether a code is usually a subcontract, material, labor or other cost. Some builders track that as a second dimension in their software. In QuickBooks Online Advanced, Aequo AP notes that cost groups default to Labor, Material, Equipment, Subcontractor and Miscellaneous. On Plus, many builders use products and services for cost codes and separate accounts for cost type. Our builder chart of accounts guide shows how the pieces fit.

This list is a starting point

It is a generic starter written by BrikBooks, not an industry standard, and it is not tied to any software. Your estimator and your superintendent should review it before you adopt it.

Want it set up for you?

Our team builds your cost code list with you, loads it into QuickBooks Online and your project software, and checks that budget and actual compare cleanly. Our founder reviews every close. We quote a flat monthly price for each builder, starting at $1,500 a month, with typical engagements between $2,500 and $8,500 a month. Start with a $1,500 Margin Review for written findings. See job costing, construction bookkeeping, pricing or request a Relationship Assessment.

Sources

Common questions

How many cost codes should a home builder have?

Enough to see where money goes, few enough that coding is quick. Start from a short list and add codes only when you need to act on the detail.

Can I use this list in QuickBooks Online?

Yes. Many builders use products and services as cost codes, tagged on each bill line along with the house in the Customer/Project column.

Is this the same list as the CSI MasterFormat?

No. It is a simple starter list ordered by how a house is built, not a standard classification.

Should allowances be separate cost codes?

Yes. One line per allowance makes overages and underages visible.

Can you set up cost codes for my business?

Yes. We build and load your cost code list during onboarding.

Related

By John Mos, Founder. Updated . We do not give tax or legal advice. Please ask your CPA or attorney.