Recording a construction draw when the lender pays subs directly
How to record a draw in QuickBooks Online when the lender or title company pays your subcontractors and suppliers instead of wiring the money to you.
Short answer: When the lender or title company pays a sub directly, no cash touches your bank, but the bill is still paid and the draw still happened. In QuickBooks Online, enter the sub's bill as usual, then close it with a credit from the construction loan (spec home) or from the customer's payment (custom home) instead of a bank payment.
Why this draw is easy to get wrong
Lenders and title companies often protect themselves by paying the people who did the work. A Porter Wright law alert on construction lending explains that the lender or disbursing agent can make checks payable to the subcontractor directly, or payable to both the contractor and the subcontractor so both must endorse. Some title companies disburse straight to subs and suppliers who have turned in conditional lien waivers, and some always do on the final draw. The money never hits your bank account, so the bank feed shows nothing. That is how three errors creep in: the bill stays open in accounts payable, the loan balance in the books is lower than the lender's statement, and the house looks underbilled or under cost. Our construction loan draw process guide covers the draw itself. This guide is only about the entries.
Get the disbursement detail first
Ask the lender or title company for the draw disbursement statement. You need, for each draw: the total funded, each payee and amount, any fees or interest taken out of the draw, any retainage held back and the date. Match each payee to an open bill. If a sub was paid more or less than your bill, find out why before you record anything, because that difference is usually a missing change order, a short-paid retainage or a lien waiver problem. See lien waivers.
Want lender-paid sub draws recorded correctly? Request a Relationship Assessment.
Spec home on your own construction loan
On a spec home the loan is yours. The draw raises the construction loan liability for that house, and the costs sit in spec inventory until the house sells. See spec home accounting. The steps in QuickBooks Online:
- Enter each bill from the sub or supplier as usual, coded to the house and cost code. If you use Buildertrend or JobTread, the bill may already be there from the sync.
- Record a journal entry for the direct payments. Credit the construction loan account for that house for the total paid to subs. Debit accounts payable once for each sub, with the sub's name in the Name column.
- Apply the credits to the bills. Open Pay bills, pick the bills and enter the amounts in the Credit Applied column, with nothing paid from the bank.
This is the same two-step method Intuit's help page describes for one bank payment that covers several vendor bills. The only change is that the credit side of the journal entry is the loan account, not the bank. Intuit also warns not to use a check or expense to pay a bill already entered, because the bill will still look unpaid.
Some builders prefer a clearing account instead of a journal entry. Set up a bank-type account named something like "Lender direct pay clearing," record the draw as a deposit into it from the construction loan account, then pay each bill from it through Pay bills. The clearing account should be back to zero after every draw. Either way works. Pick one and use it every time.
Custom home on the owner's loan
On a custom home the loan belongs to your client, and the draw is your client paying you through their lender. So the lender paying your sub is really two things at once: your customer paid part of your invoice, and you paid your sub.
- Invoice the draw to the customer or project as usual.
- Receive the customer payment for the full draw into the clearing account, then record a transfer from the clearing account to the bank for the part actually wired to you.
- Pay the sub bills from the clearing account through Pay bills. The clearing account should end at zero.
Your income, accounts receivable and accounts payable then all match the real deal. If the lender holds back retainage, keep it as a receivable until it is released. See retainage and customer deposits.
A SAMPLE draw (made-up numbers)
Spec house at 14 Oak Lane. The lender funds a $62,000 draw. The title company pays the framer $38,000 and the window supplier $16,000 directly, takes a $200 inspection fee and wires the remaining $7,800 to you. In QuickBooks Online: the framer and window bills are already entered. One journal entry credits the 14 Oak Lane construction loan $54,000 and debits accounts payable $38,000 (framer) and $16,000 (window supplier), and those credits are applied in Pay bills. The $7,800 wire is a bank deposit from the construction loan. A separate entry charges the $200 fee to the house and credits the loan. The loan goes up by $62,000 in total, which should match the lender's draw statement to the dollar. How fees and interest are treated for tax is a question for your CPA.
Joint checks
If the lender issues a check payable to you and the sub together, and you endorse it over, the money still went to the sub. Record it the same way as a direct payment. If the joint check is deposited to your bank and you then pay the sub, record a normal draw deposit and a normal bill payment.
Checks after every draw
- The construction loan balance for the house equals the lender's statement.
- No bills paid by the lender are still open in accounts payable.
- The clearing account, if you use one, is zero.
- Cost to date by lender line still ties to the draw budget. See lender draw budget vs job budget.
- A lien waiver is on file for every direct payment.
How we help
Our team records every draw from the lender's disbursement detail, closes the right bills, keeps each house's loan tied to the lender's statement and builds the next draw package. Our founder reviews every close. We quote a flat monthly price for each builder, starting at $1,500 a month, with typical engagements between $2,500 and $8,500 a month. Start with a $1,500 Margin Review for written findings. See construction bookkeeping, job costing, draw package checklist, pricing or request a Relationship Assessment.
Sources
- Porter Wright Morris and Arthur LLP, Law Alert, September 2013 (construction loan disbursement: direct and joint checks, voucher method)
- Devon Title Agency, New Construction Checklist (direct disbursement to subcontractors and suppliers)
- QuickBooks Online, Record a bill payment by EFT, ATM card, or debit card (journal entry applied as credits in Pay bills)
- QuickBooks Online, Differences between bills, checks, and expenses
Common questions
How do I record a construction draw paid directly to a subcontractor?
Enter the sub's bill as usual. On a spec home, record a journal entry that credits the construction loan and debits accounts payable for that sub, then apply the credit to the bill in Pay bills. On a custom home, receive the customer payment and pay the bill through a clearing account.
Is a construction loan draw income?
Not on a spec home on your own loan. It is borrowed money that raises the loan balance. On a custom home, the draw is your customer paying your invoice through their lender.
Why is my construction loan balance lower than the lender's statement?
Usually because direct payments to subs, fees or interest taken from the draw were never recorded. Record the full draw from the disbursement statement.
Can I use a check or expense to record a bill the lender paid?
No. Intuit warns that paying an entered bill with a check or expense leaves the bill looking unpaid. Use Pay bills with a credit or a clearing account.
How do I record a joint check from a construction lender?
If you endorsed it to the sub, record it like a direct payment. If you deposited it and paid the sub yourself, record a normal draw deposit and bill payment.
Can you record our draws and keep the loans tied out?
Yes. Our team records each draw from the lender's detail and ties each house's loan to the statement every month.
Related
- Construction loan draw process
- Construction draw package checklist
- Lender draw budget vs job budget
- Spec home accounting
- Construction bookkeeping
- Request a Relationship Assessment
By John Mos, Founder. Updated . We do not give tax or legal advice. Please ask your CPA or attorney.
See where your margin goes, house by house.
Tell us about your homes and your books. If we are a fit, we start with a $1,500 Margin Review: written findings and a fixed quote in 10 business days, credited to your onboarding fee if you sign up.